Residential On-Grid
1 - 5 kW
7 - 30 kW

Grid-Connected Rooftop Solar System

High-Efficiency Solar Modules

Smart On-Grid Inverter with MPPT

Net Metering as per DISCOM Regulations

Real-Time Generation Monitoring
System capacity, configuration and technical specifications are subject to site conditions, load requirements and applicable DISCOM / regulatory provisions.
Residential Hybrid
1 - 5 kW
7 - 30 kW

Solar + Battery + Grid Configuration

Intelligent Hybrid Inverter

Battery Backup for Essential Loads

Smart Energy & Battery Management

Real-Time System Monitoring
System capacity, configuration and technical specifications are subject to site conditions, load requirements and applicable DISCOM / regulatory provisions.
C&I On-Grid
7 kW - 500 kW

Grid-Connected C&I Solar System

High-Efficiency Solar PV Modules

Three-Phase On-Grid Inverter

Optimized for Daytime Energy Consumption

Centralized Generation & Performance Monitoring
System capacity, configuration and technical specifications are subject to site conditions, load requirements and applicable DISCOM / regulatory provisions.
C&I Hybrid
7 kW - 500 kW

Solar + Battery Storage + Grid

Bidirectional Hybrid Inverter / PCS

Peak Management & Power Backup

Intelligent Energy Management System

Scalable Storage Based on Load Requirement
System capacity, configuration and technical specifications are subject to site conditions, load requirements and applicable DISCOM / regulatory provisions.
Submit Enquiry

How GK Energy Solar Rooftop works
-
1
Sunlight
Sunlight falls on the solar panels on your roof.
-
2
Solar panels
Panels turn sunlight into DC electricity.
-
3
Inverter
The inverter converts DC into AC power your home can use.
-
4
Your home
AC power runs your lights, appliances and more.
-
5
Net meter
A two-way meter records the power you use and the power you export.
-
6
Grid
Extra power flows to the grid, earning you credits on your bill.
Today

Electric bill every month

Complete dependence on grid

Tariff increases affect you

Power cuts stop everything

Unused roof space
With GK Solar

Lower electricity bills

Generate electricity on your own roof

Greater control over long-term energy cost

Hybrid option can add backup capability

Roof becomes an energy-producing asset
☀ Rooftop Solar ROI Calculator Maharashtra · MSEDCL
1 · Monthly consumption ▶
2 · Tariff slabs — editable ▶
| Slab | From | To | ₹/unit |
|---|
3 · Solar system & subsidy ▶
4 · Bank loan (set 0 if self-funded) ▶
5 · Long-term assumptions ▶
Slab-wise energy charge
Monthly bill build-up
25-year projection — without loan & with bank loan
Without bank loan Self-funded
With bank loan Financed

Subsidy Made Simple And Safe
₹18,000 per kW
(for society common areas)
Housing society / RWA common facilities
(subject to applicable scheme limits)
₹30,000 per kW
(for first 2 kW)
₹18,000 per kW
(for additional 1 kW, up to 3 kW)
Max ₹78,000
(for standard residential systems)
Why your subsidy is safe with GK
Eligible / Registered Vendor
Choose a vendor meeting the applicable scheme requirements.
Correct Process Before Installation
GK helps complete the required application and approval steps in the correct sequence.
Compliant Components & Documentation
GK manages applicable module/product requirements, installation documentation, DISCOM coordination and metering.

Frequently asked questions about GK's Solar Rooftop
Understanding Rooftop Solar
What is a rooftop solar system?
A rooftop solar system uses solar panels installed on a suitable roof to generate electricity from sunlight. The electricity can be used within the property, reducing the power purchased from the grid. The right system depends on electricity consumption, sanctioned load, usable roof area, shadow conditions, and technical feasibility.
How does an on-grid rooftop solar system work?
Solar panels generate direct current electricity during the day. An inverter converts it into alternating current electricity for use in the home or business. When permitted under the applicable net-metering arrangement, surplus generation is exported to the grid. When solar generation is insufficient, electricity is imported from the grid. Billing is based on applicable Discom regulations and tariffs.
Will an on-grid solar system work during a power cut?
A standard on-grid system automatically shuts down during a grid outage to protect utility personnel and equipment. Backup during a power cut requires a compatible hybrid or off-grid system, batteries and prescribed safety equipment. GK Energy can recommend the appropriate configuration after assessing your backup requirements.
Is rooftop solar suitable for my home or business?
Rooftop solar can be suitable for homes, housing societies, shops, offices, institutions and industrial facilities that have adequate, structurally sound and sufficiently shade-free roof space. Electricity usage, connection type, sanctioned load, roof ownership and local approvals also affect feasibility. A site survey is the best way to confirm suitability.
System Size, Savings and Roof Requirements
How is the required solar capacity calculated?
We review your electricity consumption, recent bills, sanctioned load, daytime usage, available roof area, orientation, shading and applicable utility rules. An initial estimate can be prepared from your electricity bill; the final capacity and design are confirmed after document review and a technical site survey.
How much roof space is required?
The requirement varies with module wattage, roof type, layout, access pathways, setbacks, and shadows. As a broad planning reference, approximately 60 to 80 square feet of usable, shade-free area may be required per kW. The actual area is confirmed through a site survey and layout design.
How much can I save with rooftop solar?
Savings depend on solar generation, electricity tariff, system size, self-consumption, roof orientation, shading, maintenance and changes in consumption after installation. Many suitable residential systems can substantially reduce the variable portion of the electricity bill, but fixed charges and other applicable charges may continue. GK Energy will provide an indicative estimate based on your bill and site conditions.
What information is needed for an initial estimate?
We generally require your name, mobile number, installation location, pin code, property type, monthly bill range, and a recent electricity bill. These details help us assess the connection, consumption, and likely system capacity before scheduling the next step.
PM Surya Ghar Subsidy and Net Metering
Is government subsidy available for rooftop solar?
Eligible residential consumers may receive Central Financial Assistance under PM Surya Ghar Muft Bijli Yojana, subject to the prevailing scheme guidelines, approved components, vendor requirements, portal process, inspection and successful commissioning. The currently notified subsidy is Rs 30,000 for 1 kW, Rs 60,000 for 2 kW, and up to Rs 78,000 for systems of 3 kW or above. Scheme terms may be amended by the government.
Is subsidy available for commercial or industrial projects?
The residential subsidy does not apply to ordinary commercial or industrial rooftop projects. Eligible Group Housing Societies and Resident Welfare Associations may receive assistance in qualifying common facilities under the prevailing scheme. Commercial and industrial customers typically evaluate solar through electricity-cost savings, applicable tax treatment, and financing.
What is net metering?
Net metering is an approved billing arrangement in which a bidirectional meter records electricity imported from and exported to the grid. Exported energy is adjusted or settled in accordance with applicable Discom regulations and Discom procedures. The grid should not be considered a battery, and approval remains subject to technical and regulatory conditions.
Who supports the subsidy and net-metering process?
GK Energy or its authorised partner supports customers with document requirements, application stages, technical submissions, and coordination. Customers must provide accurate documents, signatures, access, payments, and confirmations on time. Application approval, inspection, meter activity and subsidy disbursement remain under the control of the relevant government authorities, Discoms and participating banks.
How long do approvals and subsidy processing take?
Timelines depend on application completeness, technical feasibility, site readiness, MSEDCL workload, meter availability, inspection, and government portal processing. GK Energy will provide stage-wise updates and actively coordinate the process but cannot guarantee timelines controlled by external authorities.